Getting ready for the midterm of CS605 (Advanced Software Engineering)? Here is everything in one place: solved MCQs, subjective questions with answers and short notes and key terms, gathered from past papers and files shared by students. No duplicates and all the answers are checked and verified. Use the tabs above to switch between Objective, Subjective and Short Notes & Key Terms, and tap Show answer only after you have tried the question yourself. Best of luck with your exam!
Part 1: Objective (MCQs)
Q1. A law affirming that to continue after a certain level of performance has been reached will result in a decline in effectiveness. This law is known as ______.
- Law of Diminishing returns
- Law of effectiveness
- Law of Saturation
- Law of Marketing returns
Show answer
Answer: (a) Law of Diminishing returns
Q2. In ______ a team is structured along a traditional hierarchy of authority.
- closed paradigm
- synchronous paradigm
- random paradigm
- open paradigm
Show answer
Answer: (a) closed paradigm
Why: Constantine's closed paradigm follows the traditional hierarchy of authority. (The shared copy printed the last option as "pen paradigm", a typo for "open paradigm".)
Q3. MMTC is the abbreviation of
- measured time to change
- mean time to collaborate
- mean time to change
- measure time to cope
Show answer
Answer: (c) mean time to change
Q4. The rapid application development (RAD) model is
- Another name for component-based development.
- A useful approach when a customer cannot define requirements clearly
- A high speed adaptation of the linear sequential model.
- All of the given
Show answer
Answer: (c) A high speed adaptation of the linear sequential model.
Q5. While managing the historical data, we should consider the following EXCEPT
- Data should be collected only from scientific projects and applications
- Data should be collected from many projects
- Data should be consistent
- Correct data should be taken
Show answer
Answer: (a) Data should be collected only from scientific projects and applications
Why: A baseline should come from many projects with similar applications, not only scientific ones.
Q6. Quality costs may be divided into costs associated with
- prevention, appraisal, and failure
- people, process, and product
- customers, developers, and maintenance
- all of the given
Show answer
Answer: (a) prevention, appraisal, and failure
Q7. When software is delivered to a client and the client then reports a bug in it, that bug is termed as a
- Error
- Defect
- Mistake
- Fault
Show answer
Answer: (b) Defect
Why: A problem found before delivery is an error; a problem found after delivery is a defect.
Q8. The ______ model is used to overcome issues related to understanding and capturing of user requirements.
- Rapid Prototyping
- Water fall
- Build and Fix
- None of the above
Show answer
Answer: (a) Rapid Prototyping
Q9. The software plan is not a static document; it is frequently adjusted to make the project appear on track to meet all deadlines and quality targets.
- True
- False
Show answer
Answer: (a) True
Why: Source key is True and is kept. The plan is a living document that is adjusted as the project proceeds. The wording "to make the project appear on track" is odd, so treat this as a source-key item.
Q10. Timeline chart is also known as the ______ chart.
- Gantt
- PERT
- FREE LANCE
- None of the given
Show answer
Answer: (a) Gantt
Q11. The processes at ______ focus on continually improving process performance through both incremental and innovative technological changes/improvements.
- Level 5
- Level 1
- Level 4
- Level 3
Show answer
Answer: (a) Level 5
Q12. In order to measure the design quality, if the frequency of ripple defects is too large, then it means that there is tight coupling and hence the
- design is maintainable
- design is not maintainable
- design has completed
- none of the given
Show answer
Answer: (b) design is not maintainable
Q13. The only reason for an estimate to be unreliable is lack of experience related to the application on the part of the estimator.
- True
- False
Show answer
Answer: (b) False
Why: Unclear scope, poor historical data, changing requirements and optimism also make estimates unreliable.
Q14. Usually the performance of an organization changes overnight.
- True
- False
Show answer
Answer: (b) False
Why: Process and organizational improvement is gradual.
Q15. The formal methods model of software development makes use of mathematical methods to
- define the specification for computer-based systems
- all of the given
- develop defect free computer-based systems
- verify the correctness of computer-based systems
Show answer
Answer: (b) all of the given
Q16. Which one of the following describes the data and control to be processed, function, performance, constraints, interfaces, and reliability?
- Product Quality
- Software scope estimation
- Resources requirements
- Time requirements
Show answer
Answer: (b) Software scope estimation
Q17. The projects are classified into the following categories EXCEPT
- New application development
- Reengineering projects
- Concept development projects
- Marketing Development Projects
Show answer
Answer: (d) Marketing Development Projects
Q18. Quantitative process-improvement objectives for the organization are established, and continually revised to reflect changing business objectives, at ______.
- Level 3
- Level 2
- Level 5
- Level 1
Show answer
Answer: (c) Level 5
Q19. Reliability of software is a
- functional requirement
- non-functional requirement
- Design Requirement
- None of the given
Show answer
Answer: (b) non-functional requirement
Q20. Build and Fix model is a ______ type of software development activity.
- Mathematical
- Perfect
- Haphazard
- Planned
Show answer
Answer: (c) Haphazard
Q21. Which of the following is NOT part of the software development loop?
- Status Quo
- Problem definition
- Technical development
- Task set
Show answer
Answer: (d) Task set
Why: The development loop is status quo, problem definition, technical development and solution integration.
Q22. Level 1 of CMM is known as
- Managed
- Defined
- Initial
- Repeatable
Show answer
Answer: (c) Initial
Q23. According to DeMarco a good project manager
- should be very nervous
- should be very strict in official matters
- should not ignore any mistake from his team members
- should have a big heart and should ignore small mistakes
Show answer
Answer: (d) should have a big heart and should ignore small mistakes
Q24. The best project team organizational model to use when tackling extremely difficult problems is the
- chief programmer team model
- democratic decentralized model
- controlled decentralized model
- controlled centralized model
Show answer
Answer: (b) democratic decentralized model
Q25. Which factor is the LEAST important when choosing the organizational structure for a software team?
- degree of communication desired
- predicted size of the resulting program
- rigidity of the delivery date
- size of the project budget
Show answer
Answer: (d) size of the project budget
Q26. The extent to which a program satisfies its specification and fulfills the customer's mission objectives is said to be achieving
- Usability
- Efficiency
- Reliability
- Correctness
Show answer
Answer: (d) Correctness
Q27. Integrity means that the software should
- help the users to enjoy usability
- none of the given
- withstand an attack from a hacker
- help the hacker to hack the system
Show answer
Answer: (c) withstand an attack from a hacker
Q28. The degree of uncertainty that the product will meet its requirements and be fit for its intended use is the
- Cost risk
- Schedule risk
- Performance risk
- None of the given choices
Show answer
Answer: (c) Performance risk
Q29. The Spiral model of software development is iterative in nature.
- True
- False
Show answer
Answer: (a) True
Q30. ______ is data that influences an elementary process of the application being counted.
- Elementary Process
- External Query
- External Output
- Control Information
Show answer
Answer: (d) Control Information
Q31. Empirical models are statistical models and are based upon historic data.
- True
- False
Show answer
Answer: (a) True
Q32. An entity which defines a many-to-many relationship between two or more entities is called
- Associative Entity Type
- Attributive Entity Type
- Entity Subtype
- None of these
Show answer
Answer: (a) Associative Entity Type
Q33. Software risk impact assessment should focus on consequences affecting
- performance, support, cost, schedule
- planning, resources, cost, schedule
- marketability, cost, personnel
- business, technology, process
Show answer
Answer: (a) performance, support, cost, schedule
Q34. Every task or group of tasks should be associated with a project ______.
- Schedule
- Member
- Manager
- Milestone
Show answer
Answer: (d) Milestone
Q35. Every task should be assigned to a specific team ______.
- Member
- Manager
- Organizer
- None of the given
Show answer
Answer: (a) Member
Q36. Which one is NOT a software project planning activity carried out by the project manager for estimation?
- Software scope estimation
- Resources requirements
- Time requirements
- Product Quality
Show answer
Answer: (d) Product Quality
Q37. While performing risk analysis, the impact of a risk cannot be measured quantitatively.
- True
- False
Show answer
Answer: (b) False
Why: Impact is estimated numerically, for example as cost, and combined with probability to give risk exposure.
Q38. The proactive risk management philosophy is sometimes termed the Indiana Jones school of risk management.
- True
- False
Show answer
Answer: (b) False
Why: The Indiana Jones school is the reactive one ("don't worry, we will find a way"). Proactive management plans ahead.
Q39. The number of people required for a software project is determined
- after an estimate of the development effort is made
- from an assessment of the technical complexity of the system
- by the size of the project
- all of the given
Show answer
Answer: (a) after an estimate of the development effort is made
Q40. Defect Removal Efficiency (DRE) can be measured by ______, where E is the errors found before delivery and D is the defects found after delivery (typically within the first year of operation).
- DRE = E / (E + D)
- DRE = E − (E + D)
- DRE = E × (E + D)
- None of the given
Show answer
Answer: (a) DRE = E / (E + D)
Q41. In function point analysis, EO stands for
- Export operation
- Export output
- External output
- None of these
Show answer
Answer: (c) External output
Q42. Which of these software characteristics are used to determine the scope of a software project?
- context, lines of code, function
- context, function, communication requirements
- information objectives, function, performance
- communications requirements, performance, information objectives
Show answer
Answer: (c) information objectives, function, performance
Why: Scope is described by context, information objectives, function and performance. Option (c) is the only option that lists only valid characteristics.
Q43. ______ is the first stage of the waterfall life cycle model.
- Requirement definition
- Operation
- Unit testing
- Implementation
Show answer
Answer: (a) Requirement definition
Q44. Which of the following is NOT a management part of software development activities?
- Coding
- Configuration Management
- Quality Assurance
- Project planning
Show answer
Answer: (a) Coding
Why: The shared key marked "Project planning (not sure)", but project planning, QA and configuration management are management activities. Coding belongs to the construction part.
Q45. Software process and product quality are controlled at ______.
- level 1
- initial level
- level 4
- level 3
Show answer
Answer: (c) level 4
Q46. QA is an activity performed ______ the software development.
- at the initial stage of
- at the final stage of
- throughout
- at the middle of
Show answer
Answer: (c) throughout
Q47. ______ is the ability to encourage people to create and feel creative.
- Organization
- Motivation
- Innovation
- Managerial Identity
Show answer
Answer: (c) Innovation
Why: In Weinberg's MOI model, M = Motivation, O = Organization, I = Ideas or Innovation.
Q48. By default every organization is working at
- level 1
- level 0
- level 3
- level 4
Show answer
Answer: (a) level 1
Q49. Software Engineering is the set of ______ and ______ to develop software.
- languages, processes
- classes, objects
- processes, tools
- tools, objects
Show answer
Answer: (c) processes, tools
Q50. Software has a very close relationship with
- Biology
- Physics
- Chemistry
- Economics
Show answer
Answer: (d) Economics
Q51. COCOMO is the classic LOC cost-estimation formula and uses thousand delivered source instructions (KDSI) as its ______ of size.
- LOC
- milestone
- unit
- none of the given
Show answer
Answer: (c) unit
Q52. A(n) ______ deadline is one of the reasons for project failure.
- achievable
- feasible
- unrealistic
- realistic
Show answer
Answer: (c) unrealistic
Q53. The ______ model is very sensitive to risk.
- Spiral
- waterfall
- incremental
- RAD
Show answer
Answer: (a) Spiral
Q54. ______ is the ability to encourage technical people to produce their best.
- improvement
- motivation
- innovation
- creation
Show answer
Answer: (b) motivation
Q55. Capers Jones is a famous researcher in the field of ______ who founded a company named Software Productivity Research.
- Biology
- Chemistry
- Mathematics
- Software Engineering
Show answer
Answer: (d) Software Engineering
Q56. In the ______ model, user feedback is received very quickly because the product is delivered in small versions.
- waterfall
- spiral
- incremental
- object oriented
Show answer
Answer: (c) incremental
Q57. Which approach is better from the team spirit point of view?
- Controlled Decentralized
- Informal, interpersonal procedures
- Controlled Centralized
- Democratic Decentralized
Show answer
Answer: (d) Democratic Decentralized
Q58. Construction activities are directly related to the ______ of the software.
- Installation
- risk analysis
- development
- debugging
Show answer
Answer: (c) development
Q59. Continuous process improvement is enabled by ______ feedback from the ______.
- analytical, user
- mathematical, user
- logical, process
- qualitative, process
Show answer
Answer: (d) qualitative, process
Q60. The major activities related to software construction are
- requirement gathering, design development, coding and testing
- installation and training
- quality assurance, configuration and planning
- implementation and management
Show answer
Answer: (a) requirement gathering, design development, coding and testing
Q61. If requirements are uncertain, ______ will be suitable.
- Incremental
- RAD
- Waterfall
- Prototype
Show answer
Answer: (d) Prototype
Why: The shared key said Waterfall, which is wrong: waterfall needs well-understood requirements up front. Prototyping is the model for uncertain requirements.
Q62. Capability Maturity Model (CMM) is used to judge the ______ of an organization.
- Efficiency
- Performance
- Productivity
- Maturity
Show answer
Answer: (d) Maturity
Q63. Defects per function point are a ______ metric.
- one
- two
- three
- four
Show answer
Answer: (a) one
Why: "Defects per function point is one metric which relates two individual measures" (defects and size). Source key kept.
Q64. ______ is the measure of how many defects are removed by the quality assurance processes before the product is shipped for operation.
- Defect removal efficiency
- defect density
- None of these
Show answer
Answer: (a) Defect removal efficiency
Q65. For software, the total number of requirements is equal to ______.
- Functional requirements
- non-functional requirements
- Functional requirements and non-functional requirements
- None of these
Show answer
Answer: (c) Functional requirements and non-functional requirements
Why: Nr = Nf + Nnf.
Q66. In the Capability Maturity Model (CMM), ______ performs optimization.
- level 1
- level 2
- level 3
- level 5
Show answer
Answer: (d) level 5
Q67. If a software developer is going to develop software for a nuclear reactor, which factor(s) will be more important?
- cost effectiveness
- performance
- reliability
- both b and c
Show answer
Answer: (d) both b and c
Q68. Fred Brooks is a famous software engineer who wrote a great book related to software engineering named ______.
- The Mythical Man-Month
- A Mathematical Man
- Software Methodologies
- None of the above
Show answer
Answer: (a) The Mythical Man-Month
Q69. The W5HH principle consists of seven ______.
- Answers
- Questions
- points
- steps
Show answer
Answer: (b) Questions
Q70. In the Rational Unified Process (RUP), the horizontal dimension represents the ______ aspect of the process.
- Dynamic
- Static
- Both
Show answer
Answer: (a) Dynamic
Q71. There are two very different approaches to cost estimation. The older approach is called LOC estimation, since it is ______ on initially estimating the number of lines of code that will need to be developed for the project.
- based
- good
- None of given
- bad
Show answer
Answer: (a) based
Q72. Task coordinators are appointed for a short period of time in which team organization? Select the correct option.
- controlled centralized
- democratic decentralized
- controlled decentralized
- formal impersonal approach
Show answer
Answer: (b) democratic decentralized
Q73. Which model is the opposite of the waterfall model?
- Spiral
- Prototype
- Synchronize and Stabilize
- Incremental
Show answer
Answer: (b) Prototype
Why: Source key kept: waterfall assumes requirements are known up front, while prototyping is used when they are not. Not independently verified against the lecture wording.
Q74. The MOI model of leadership was developed by
- Don Carlos
- Newton
- Weinberg
- Edison
Show answer
Answer: (c) Weinberg
Q75. Each process defines certain deliverables known as ______.
- work products
- softwares
- final products
- items
Show answer
Answer: (a) work products
Q76. ______ procedures include QA activities, design and code reviews, and status meetings.
- Formal, interpersonal
- Informal, interpersonal
- Controlled centralized
- Formal, impersonal
Show answer
Answer: (a) Formal, interpersonal
Q77. According to DeMarco, a good team leader should have only ______ characteristics.
- four
- five
- three
- seven
Show answer
Answer: (a) four
Why: Source key kept; the count could not be verified outside the lecture.
Q78. The Synchronize and Stabilize model is adopted by ______.
- Apple Macintosh
- Microsoft
- Sun Java System
- Netsol Technologies
Show answer
Answer: (b) Microsoft
Q79. The Extreme Programming model is very effective when requirements are very ______ and the project scope is very ______.
- changing, limited
- changing, unlimited
- None of these
Show answer
Answer: (a) changing, limited
Q80. Miscommunication among project staff is one of the reasons for the failure of a software project.
- True
- False
Show answer
Answer: (a) True
Q81. The waterfall model is a document-driven model.
- True
- False
Show answer
Answer: (a) True
Q82. Which paradigm structures a team loosely and depends on the individual initiative of the team members?
- Closed
- Random
- Open
- Synchronous
Show answer
Answer: (b) Random
Q83. The Spiral model has ______ dimensions.
- 2
- 3
- 4
- None of the above
Show answer
Answer: (a) 2
Q84. The ______ model of software development is a good approach when a core product is required quickly.
- Incremental
- Linear Sequential
- Prototyping
- None of the above
Show answer
Answer: (a) Incremental
Q85. Which of the following is an object-oriented life cycle model?
- Spiral
- Water fall
- Incremental
- Fountain
Show answer
Answer: (d) Fountain
Q86. The ______ model was developed keeping in mind the element of risk in software development.
- Spiral
- RAD
- Incremental
- Synchronize and Stabilize
Show answer
Answer: (a) Spiral
Q87. The vision phase in a software process focuses on ______.
- What
- Why
- How
- Change
Show answer
Answer: (b) Why
Q88. Rapid application development is another form of the ______.
- Incremental model
- Prototyping model
- Linear Sequential model
- None of the above
Show answer
Answer: (a) Incremental model
Q89. Which phase in a software process focuses on change?
- Vision
- Maintenance
- Definition
- Development
Show answer
Answer: (b) Maintenance
Q90. ______ teams generate more and better solutions than individuals and are most useful for complex problems.
- Decentralized
- Centralized
Show answer
Answer: (a) Decentralized
Q91. The MOI model of leadership stands for
- Motivation, Operationalize, Integration
- Misunderstanding, Object, Ideas
- Motivation, Organization, Innovation
- Miscommunication, Organization, Invention
Show answer
Answer: (c) Motivation, Organization, Innovation
Q92. Which activity is performed throughout software production? Select the correct option.
- Maintenance
- Development
- Analysis
- Quality Assurance
Show answer
Answer: (d) Quality Assurance
Q93. In which model is the product developed without any proper design and specifications?
- Water fall
- Build and Fix
- Prototyping
- None of the above
Show answer
Answer: (b) Build and Fix
Q94. Software project management focuses on the four P's. These are
- People, Product, Process, Problem
- People, Product, Process, Project
- People, Passion, Process, Project
- People, Passion, Planning, Project
Show answer
Answer: (b) People, Product, Process, Project
Q95. Which dimension in the Rational Unified Process model represents the dynamic aspect of the process?
- Horizontal
- Angular
- Vertical
- Regular
Show answer
Answer: (a) Horizontal
Q96. Which dimension of the Spiral model represents the cumulative cost to date?
- Radial
- Angular
- Horizontal
- Circular
Show answer
Answer: (a) Radial
Q97. In software development, ______ is performed at the end of each phase.
- Accreditation
- Validation
- Verification
- Identification
Show answer
Answer: (c) Verification
Q98. A software ______ relates individual software measures to provide a normalized view.
- Measure
- Metric
- Plan
- Attribute
Show answer
Answer: (b) Metric
Q99. We need to employ some statistical techniques and plot the results ______. These are known as statistical control techniques.
- graphically
- automatically
- manually
- personally
Show answer
Answer: (a) graphically
Q100. Quality can be measured if we measure the ______ of the product.
- correctness
- maintainability
- integrity and usability
- All of the given options
Show answer
Answer: (d) All of the given options
Q101. Which technique helps in finding whether a metric (process) is stable or unstable?
- Control chart
- Directed Graph
- Cyclic chart
- Base line graph
Show answer
Answer: (a) Control chart
Q102. If several entities are always created together and deleted together, this is a strong indication that they should be grouped into ______ logical file.
- a single
- a double
- multiple
- no
Show answer
Answer: (a) a single
Why: No key was given in the source. Entities that are always created and deleted together form one user-recognizable group of data, so they are grouped into a single logical file. (The shared options "Together, Single / Together, Double / Together, Multiple" are shortened here to the blank that matters.)
Q103. ______ give you a better insight into the state of the process or product.
- Metrics
- Efficiency
- Reliability
- Usability
Show answer
Answer: (a) Metrics
Q104. Determination of the ______ is a prerequisite of all sorts of estimates, including resources, time and budget.
- software scope
- software risk
- software quality
- software management
Show answer
Answer: (a) software scope
Q105. When more than one user interprets the same requirement in different ways, the requirement is
- None of the given
- Incomplete
- Ambiguous
- Incorrect
Show answer
Answer: (c) Ambiguous
Q106. Software is extremely easy to operate, with an intuitive interface conforming to the best GUI practices of the industry. How much training does it need?
- Less than one hour
- Less than two hours
- Less than five hours
- Less than ten hours
Show answer
Answer: (a) Less than one hour
Why: Source key kept (excellent usability = very little training). The exact scale was not verified against the lecture.
Q107. Metrics to assess the quality of the analysis models and the corresponding software specification were proposed
- in 1993-1999
- by Ricado in 1993
- by Davis in 1990
- by Davis in 1993
Show answer
Answer: (d) by Davis in 1993
Q108. Which statement is correct?
- None of the given
- The greater the dependency between the components, the lesser the coupling
- The lesser the dependency between the components, the greater the coupling
- The greater the dependency between the components, the greater the coupling
Show answer
Answer: (d) The greater the dependency between the components, the greater the coupling
Q109. A Function/Test matrix is a type of
- Interim Test report
- Final test report
- Project status report
- Management report
Show answer
Answer: (a) Interim Test report
Why: The shared key said Project status report. In the standard test-reporting scheme (W. Perry, Effective Methods for Software Testing, step 5) the Function/Test Matrix is the first of the interim test reports, so it is corrected. The lecture wording could not be checked.
Q110. The most important objective of any engineering activity is to produce a high quality product with limited resources and
- time
- persons
- cost
- metrics
Show answer
Answer: (a) time
Q111. The extent to which access to software or data by unauthorized persons can be controlled is called
- None of given
- Efficiency
- Reliability
- Integrity
Show answer
Answer: (d) Integrity
Q112. The amount of computing resources required by a program to perform its function is called
- Efficiency
- Integrity
- Reliability
- None of given
Show answer
Answer: (a) Efficiency
Q113. The ______ technique was initially developed for manufacturing processes in the 1920s by Walter Shewhart.
- Upper Control Line
- Control chart
- CMP
- Quality
Show answer
Answer: (b) Control chart
Q114. In the context of moving range and individual control charts, UNPL stands for
- Universal Natural Process Line
- Universal Natural Process Limit
- Upper Natural Process Limit
- Upper Natural Process Line
Show answer
Answer: (c) Upper Natural Process Limit
Q115. The effort required to test a program to ensure that it performs its intended function is called
- Security
- Testability
- Debugging
- Bug fixing
Show answer
Answer: (b) Testability
Why: No key was marked in the source. This is McCall's definition of testability.
Q116. The extent to which a program can be expected to perform its intended function with the required precision is called
- Usability
- Reliability
- Portability
- Maintainability
Show answer
Answer: (b) Reliability
Q117. Which one of the following is NOT a useful indicator of software quality?
- Correctness
- Code size
- Maintainability
- Integrity
- Usability
Show answer
Answer: (b) Code size
Q118. Which one of the following does not belong to a strategy for dealing with risk?
- Risk avoidance
- Security risk assessment
- Risk monitoring
- Risk management and contingency planning
Show answer
Answer: (b) Security risk assessment
Q119. Three categories of risks are
- Business risks, personnel risks, budget risks
- Project risks, technical risks, business risks
- Planning risks, technical risks, personnel risks
- Management risks, technical risks, design risks
Show answer
Answer: (b) Project risks, technical risks, business risks
Why: No key was marked in the source. Project, technical and business risks is the standard (Pressman) classification.
Q120. The software reengineering process model includes restructuring activities for which of the following work items?
- Code
- Documentation
- Data
- All of the given options
Show answer
Answer: (d) All of the given options
Q121. One graphical technique for determining whether a process exhibits out-of-control change behavior is a
- Control chart
- Fishbone diagram
- Pareto diagram
- Process diagram
Show answer
Answer: (a) Control chart
Q122. The first step in project planning is to
- Determine the budget.
- Select a team organizational model.
- Determine the project constraints.
- Establish the objectives and scope.
Show answer
Answer: (d) Establish the objectives and scope.
Q123. FAST is the abbreviation of
- Facilitated Application Specification Technology
- Facilitated Application Specification Technique
- Facilitated Application Specialization Technique
- None of the above option
Show answer
Answer: (b) Facilitated Application Specification Technique
Q124. Defects per unit function point is a
- Measure
- Metric
- Measurement
- None of the above
Show answer
Answer: (b) Metric
Q125. The characteristics of well-developed software are
- Reliability
- User friendliness
- Cost effectiveness
- All of the above
Show answer
Answer: (d) All of the above
Q126. Software engineering is a balancing act.
- Yes
- No
Show answer
Answer: (a) Yes
Q127. Which is the process of balancing among the different characteristics of software?
- Software Testing
- Software Development
- Software Management
- Software Risk Analysis
Show answer
Answer: (b) Software Development
Why: Source key kept; not independently verified against the lecture wording.
Q128. Which one of the following is NOT a software project scheduling principle or technique?
- Interdependency identification
- Time allocation
- Effort validation
- Function point analysis
Show answer
Answer: (d) Function point analysis
Why: The scheduling principles are compartmentalization, interdependency, time allocation, effort validation, defined responsibilities, defined outcomes and defined milestones. Function point analysis is a size/estimation technique.
Q129. Which one of the following is the 4th level of the SEI Capability Maturity Model?
- initial or ad hoc
- optimizing
- managed
- defined
- repeatable
Show answer
Answer: (c) managed
Q130. Which one of the following activities does NOT belong to the Risk Mitigation, Monitoring and Management (RMMM) plan?
- Risk Projection
- Risk Mitigation
- Risk avoidance
- Risk Management and Contingency Planning
Show answer
Answer: (a) Risk Projection
Q131. The prototyping model of software development is
- A reasonable approach when requirements are well defined.
- A useful approach when a customer cannot define requirements clearly.
- The best approach to use for projects with large development teams.
- A risky model that rarely produces a meaningful product.
Show answer
Answer: (b) A useful approach when a customer cannot define requirements clearly.
Q132. Which maturity level is characterised by: "Basic project management processes established to track cost, schedule and functionality. Has the necessary process discipline in place to repeat earlier successes on projects with similar applications"?
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
Show answer
Answer: (b) Level 2
Q133. Defect prevention is defined as
- Avoiding defect insertion
- Avoiding defect insertion, but fixing errors when reported
- Finding and fixing errors after insertion
- Finding and fixing errors after release
Show answer
Answer: (a) Avoiding defect insertion
Why: The shared key said option (c), which describes defect detection and removal. Prevention means stopping defects from being injected in the first place.
Q134. What activity does a software project manager need to perform to minimize the risk of software failure?
- double the project team size
- request a large budget
- allow absolutely no schedule slippage
- define milestones and track progress
Show answer
Answer: (d) define milestones and track progress
Q135. The linear sequential model of software development is also known as the
- Classical life cycle model
- Fountain model
- Spiral model
- Chaos model
Show answer
Answer: (a) Classical life cycle model
Q136. Doubling the size of your software project team is guaranteed to cut project completion time in half.
- True
- False
Show answer
Answer: (b) False
Why: Brooks's law: adding people adds communication overhead, so the relationship is not linear.
Q137. Which of these benefits can be achieved when software is restructured?
- higher quality programs
- reduced maintenance effort
- software easier to test
- all of the given options
Show answer
Answer: (d) all of the given options
Q138. Which QA technique typically involves execution of the software and observation of program behavior or outcome?
- Inspection
- Walkthroughs
- Testing
- Reviews
Show answer
Answer: (c) Testing
Q139. ______ testing verifies the correct handling of the external functions provided by the software.
- Black box
- White box
- Gray box
Show answer
Answer: (a) Black box
Q140. The quality expectations of a user are that a software system performs useful functions that
- fit user needs
- perform correctly over a repeated period of time
- both a and b
Show answer
Answer: (c) both a and b
Q141. Incomplete requirements gathering can result in the ______ of the project.
- failure
- reusability
- success
- easy maintenance
Show answer
Answer: (a) failure
Q142. The root causes of project failure are
- lack of user input
- incomplete requirements and specification
- creeping requirements
- all of the given options
Show answer
Answer: (d) all of the given options
Why: The shared key marked only "creep requirement", but lack of user input, incomplete requirements and requirement creep are all listed causes, so the all-of-the-above option is the complete answer.
Q143. ______ is a bad smell when a change requires lots of little changes in a lot of different classes.
- Shotgun surgery
- Duplicated code
- Large class
- Lazy class
Show answer
Answer: (a) Shotgun surgery
Q144. If one type of change requires changing one subset of methods and another type of change requires changing another subset, it is a symptom of
- Divergent change
- Duplicated code
- Large class
- Lazy class
Show answer
Answer: (a) Divergent change
Q145. Software refactoring is a process in which
- the external behavior of the system does not change
- the internal behavior of the system does not change
- the design of the software changes
- the architecture of the software changes
Show answer
Answer: (a) the external behavior of the system does not change
Why: The shared key said (d). Refactoring restructures the internal code while the external behavior stays the same.
Q146. ______ integrates system and software disciplines into a single process improvement framework for introducing new disciplines as needs arise.
- CMM
- CMMI
- ISO
- SEI
Show answer
Answer: (b) CMMI
Q147. The following are reasons for project failure EXCEPT
- Requirements are not clear
- The name of the software
- Processes have not been established in the organization
- Unrealistic deadline
Show answer
Answer: (b) The name of the software
Q148. The main characteristic of the ______ model is risk analysis and management.
- Waterfall
- RAD
- Spiral
- Incremental
Show answer
Answer: (c) Spiral
Q149. In which team organization is there both vertical and horizontal communication?
- Controlled decentralized (CD)
- Democratic decentralized (DD)
- Controlled centralized (CC)
- Synchronous paradigm (SP)
Show answer
Answer: (a) Controlled decentralized (CD)
Q150. The prevention of defects being injected into the software can help in decreasing the cost of software.
- True
- False
Show answer
Answer: (a) True
Why: No key was marked in the source. Preventing defects avoids the cost of finding and fixing them later.
Q151. In the software development life cycle, detecting a defect sooner results in
- an increase in the cost of software
- a decrease in the cost of software
- both a and b are correct
Show answer
Answer: (b) a decrease in the cost of software
Why: No key was marked in the source. The earlier a defect is found, the cheaper it is to fix. The stem is a shared, slightly garbled version of this idea.
Q152. ______ testing verifies the correct implementation of internal units, structures and the relationships among them.
- Black box
- White box
- Gray box
Show answer
Answer: (b) White box
Q153. In the original ______ there was no provision for the feedback concept, and you could not go back to a previous stage.
- Waterfall model
- RAD
- Spiral
- Incremental
Show answer
Answer: (a) Waterfall model
Q154. Which of the following formulas is used to calculate the exposure for each risk?
- RE = Probability of the risk + Cost
- RE = Probability of the risk × Cost
- RE = Probability of the risk ^ Cost
- None of the given choices
Show answer
Answer: (b) RE = Probability of the risk × Cost
Q155. An ______ is a user identifiable group of logically related data or control information maintained within the boundary of the application.
- Internal logical file (ILF)
- External Interface file (EIF)
- External input
- External Query
Show answer
Answer: (a) Internal logical file (ILF)
Q156. The first published model of the software development process was
- Waterfall Model
- Incremental Model
- RAD Model
- Spiral Model
Show answer
Answer: (a) Waterfall Model
Q157. Project management is a(n) ______ intensive activity.
- people
- product
- process
- resource
Show answer
Answer: (a) people
Q158. An ______ is the smallest unit of activity that is meaningful to the user(s).
- Function point
- Elementary process
- Adjustment factor
- Data count
Show answer
Answer: (b) Elementary process
Q159. Which of the following is one of the mechanisms to measure the size of the software?
- Number of Comments
- Function points
- Mean time to failure
- Error index value
Show answer
Answer: (b) Function points
Q160. Software project management primarily deals with metrics related to
- Development process
- Defects
- Availability
- Productivity and quality
Show answer
Answer: (d) Productivity and quality
Q161. In the context of individual control charts, if a single metric value lies outside the UNPL, the process is
- within control
- out of control
- normalized
- not normalized
Show answer
Answer: (b) out of control
Q162. ______ distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks.
- Project tracking
- Project compartmentalization
- Project scheduling
- Project estimation
Show answer
Answer: (c) Project scheduling
Q163. In the context of degree of rigor, TSS stands for
- Task set selector
- Tasks set in schedule
- Time set selector
- Time set in schedule
Show answer
Answer: (a) Task set selector
Q164. If a company is at CMM level 3, it implicitly means that it is performing all the KPAs of
- Level 1
- Level 2 and Level 3
- Level 3 alone
- Level 1 and Level 3
Show answer
Answer: (b) Level 2 and Level 3
Why: No key was marked in the source. CMM levels are cumulative, and level 1 has no KPAs, so a level 3 company satisfies the KPAs of levels 2 and 3.
Q165. Which model is a document-driven model because a set of documents is produced at each level of the model?
- Waterfall model
- Rapid Prototyping Model
- Incremental Model
- None of the given
Show answer
Answer: (a) Waterfall model
Q166. Which of the following questions is NOT addressed when the W5HH principle is applied?
- What will be done by whom?
- Why is the system being developed?
- Where are they organizationally located?
- How much of each resource is required?
Show answer
Answer: (a) What will be done by whom?
Why: W5HH asks: Why, What, When, Who, Where, How (technically and managerially) and How much. The combined form "what will be done by whom" is not one of the seven questions.
Q167. Although there are many different estimation models developed by different researchers, all of them share which basic structure?
- E = 3.2 (KLOC)^1.05
- E = A + B × (ev)^c
- E = [LOC × B^0.333 / P]^3 × (1/t^4)
- None of the given
Show answer
Answer: (b) E = A + B × (ev)^c
Q168. Risk analysis and management involves addressing the following concerns EXCEPT
- What change might cause the risk to strike?
- What thing may go wrong in the future?
- What can happen if the web interface of the company's website changes?
- What is the nature of the software domain?
Show answer
Answer: (d) What is the nature of the software domain?
Why: Risk analysis deals with the future (what may go wrong), change (what may cause the risk to strike) and choice (what options exist). Source key kept.
Q169. Which of the following is NOT one of the characteristics used to describe a KPA?
- Resources
- Goals
- Activities
- Commitments
Show answer
Answer: (a) Resources
Q170. Which one of the following is NOT an object-oriented life cycle model?
- Extreme Programming
- Fountain Model
- Rational Unified Process (RUP) model
- Rapid Application Development Model
Show answer
Answer: (d) Rapid Application Development Model
Q171. Which one is NOT one of the generic structural paradigms proposed by Constantine?
- Closed paradigm
- Random paradigm
- Hybrid paradigm
- Synchronous paradigm
Show answer
Answer: (c) Hybrid paradigm
Q172. The degree to which software performs its function is called
- Maintainability
- Correctness
- Integrity
- Interoperability
Show answer
Answer: (b) Correctness
Q173. A system for which the physical or intellectual skills required to learn the system are low is called a highly ______ system.
- available
- usable
- maintainable
- flexible
Show answer
Answer: (b) usable
Q174. Risk mitigation involves
- reducing the impact of the risk
- reducing the risk management plan
- redesigning the contingency plan
- performing the risk analysis again
Show answer
Answer: (a) reducing the impact of the risk
Why: No key was marked in the source.
Q175. A schedule developed at the early stages of project planning is called
- macroscopic
- beta
- visionary
- concrete
Show answer
Answer: (a) macroscopic
Q176. For a project, if the value of TSS is 0.9, the degree of rigor for this project will be
- Strict
- Structured
- Casual
- Strict or Structured
Show answer
Answer: (c) Casual
Why: A low TSS (below about 1.2) falls in the casual range.
Q177. In the context of function point analysis, EI stands for
- Export input
- Expert input
- External inline
- External input
Show answer
Answer: (d) External input
Q178. If an experienced user has to take extensive training on a software before use and still finds it difficult to use, there may be issues related to
- Usability
- Portability
- Correctness
- Reliability
Show answer
Answer: (a) Usability
Q179. After building the decision tree, which formula is used to find the expected cost of an option?
- Expected Cost = Σ (path probability)i × (estimated path cost)i
- Expected Cost = Σ (path probability)i / (estimated path cost)i
- Expected Cost = (path probability)i + (estimated path cost)i
- Expected Cost = Σ (path probability)i − (estimated path cost)i
Show answer
Answer: (a) Expected Cost = Σ (path probability)i × (estimated path cost)i
Q180. In which stage of the software development loop do we try to find the solution of the problem on technical grounds and base our actual implementation on it?
- Implementation
- Testing
- Technical Development
- Technical Design
Show answer
Answer: (c) Technical Development
Q181. The Software Engineering Institute (SEI) developed a framework to measure the process maturity of software organizations. This framework is known as
- Software engineering framework
- Software life cycle model
- Capability maturity model
- Process engineering framework
Show answer
Answer: (c) Capability maturity model
Q182. According to Kraul and Streeter, "Email" is an example of which project coordination technique?
- Formal, impersonal
- Formal, interpersonal
- Electronic communication
- Interpersonal networking
Show answer
Answer: (c) Electronic communication
Q183. Which of the following is NOT one of the 5 steps defined by Reel to improve the chances of success?
- Start on the right foot
- Maintain momentum
- Make smart decisions
- Optimize Product
Show answer
Answer: (d) Optimize Product
Why: Reel's steps: start on the right foot, maintain momentum, track progress, make smart decisions, conduct a postmortem analysis.
Q184. In the context of function point analysis, EQ stands for
- External Quotation
- External Inquiry
- External Quality
- External Interface
Show answer
Answer: (b) External Inquiry
Q185. Evolutionary software process models
- do not generally produce throw-away systems
- all of the given
- can easily accommodate product requirement changes
- are iterative in nature
Show answer
Answer: (b) all of the given
Why: No key was marked in the source. All three statements are true of evolutionary models.
Q186. Which team organization has no permanent leader, with task coordinators appointed for short durations, decisions made by group consensus and horizontal communication?
- Democratic decentralized (DD)
- Controlled decentralized (CD)
- Synchronous paradigm (SP)
- Controlled centralized (CC)
Show answer
Answer: (a) Democratic decentralized (DD)
Q187. The Spiral model was first proposed by
- McCabe
- Barry Boehm
- Robert Cazeman
- William Smith
Show answer
Answer: (b) Barry Boehm
Q188. Barry Boehm suggested a systematic approach (comprising 7 questions) to project management. It is known as
- W5HH
- WHH5
- WHH7
- W7HH
Show answer
Answer: (a) W5HH
Q189. In order to use the data for estimation and drawing conclusions, it must be
- filtered
- base-lined
- stabilized
- processed
Show answer
Answer: (b) base-lined
Q190. The purpose of the feasibility analysis is to determine
- Can we use the available state of the art?
- Can we implement the given standards?
- Can we meet the design constraints?
- Can we build software to meet the scope?
Show answer
Answer: (d) Can we build software to meet the scope?
Q191. Which of the following is an advantage of using LOC (lines of code) as a size-oriented metric?
- LOC is easily computed
- LOC is a language dependent measure
- LOC is a language independent measure
- LOC can be computed before a design is completed
Show answer
Answer: (a) LOC is easily computed
Why: LOC is language dependent and hard to estimate before design, so (b), (c) and (d) are not advantages.
Q192. The most famous of the empirical models is COCOMO (Constructive COst MOdel). Which of its versions is the simplest?
- E = A + B × (ev)^c
- E = [LOC × B^0.333 / P]^3 × (1/t^4)
- E = A + B − (ev)^c
- E = 3.2 (KLOC)^1.05
Show answer
Answer: (d) E = 3.2 (KLOC)^1.05
Q193. A good metric system is one which is
- simple
- cheap
- adds a lot of value for the management
- All of the given options
Show answer
Answer: (d) All of the given options
Q194. Integrity can be measured by the following formula:
- Integrity = (1 − threat) × (1 − security)
- Integrity = Σ [(1 + threat) + (1 − security)]
- Integrity = Σ [(1 − threat) × (1 − security)]
- Integrity = Σ [(1 − threat) − (1 − security)]
Show answer
Answer: (c) Integrity = Σ [(1 − threat) × (1 − security)]
Q195. Software feasibility is based on which of the following?
- Technology, finance, time, resources
- Technical prowess of the developers
- Business and marketing concerns
- Scope, constraints, market
Show answer
Answer: (a) Technology, finance, time, resources
Q196. In a proactive risk management strategy, the main objective is to
- avoid risk
- let the risk occur and then take corrective action
- categorize the risk
- normalize the risk
Show answer
Answer: (a) avoid risk
Q197. Which of the following is NOT a valid reason for measuring software processes, products and resources?
- To characterize them
- To evaluate them
- To price them
- To improve them
Show answer
Answer: (c) To price them
Why: No key was marked in the source. The usual reasons are to characterize, evaluate, predict and improve.
Q198. LOC-based estimation techniques require problem decomposition based on
- information domain values
- project schedule
- software functions
- process activities
Show answer
Answer: (c) software functions
Why: No key was marked in the source. LOC-based estimation decomposes by software functions, while FP-based estimation uses information domain values.
Q199. A problem that threatens the success of a project but which has not yet happened is a
- Bug
- Error
- Failure
- Risk
Show answer
Answer: (d) Risk
Q200. In order to plan and run a project successfully, a project manager does NOT need to worry about the following issue:
- Product quality
- Cost estimation
- The company's name
- Risk assessment
Show answer
Answer: (c) The company's name
Q201. "Unrealistic deadline is NOT one of the reasons of project failure." This statement is
- True
- False
Show answer
Answer: (b) False
Why: No key was marked in the source. An unrealistic deadline IS one of the standard reasons for project failure, so the statement is false.
Q202. Pair programming is associated with
- RAD
- Incremental development
- Extreme Programming
- Prototyping
- Synchronize and stabilize
Show answer
Answer: (c) Extreme Programming
Q203. How many KPAs are defined for the CMM levels?
- 15
- 16
- 17
- 18
Show answer
Answer: (d) 18
Why: No key was marked in the source. The SW-CMM has 18 KPAs: 6 at level 2, 7 at level 3, 2 at level 4 and 3 at level 5.
Q204. While creating metrics for a set of projects, data should be collected from projects that belong to a small domain only.
- True
- False
Show answer
Answer: (b) False
Why: No key was marked in the source. A baseline needs data from many projects with similar applications, not a small domain.
Q205. Hardware/software tools, people and reusable software components are considered as ______ for an organization.
- Resources
- Quality Factors
- Risky Factors
- Requirement Specifications
Show answer
Answer: (a) Resources
Q206. Requirements are sometimes filled with defects. Such requirements are normally known as ______ requirements.
- Functional
- Non-functional
- Toxic
- System
Show answer
Answer: (c) Toxic
Q207. A process model defines a task set which comprises SE work tasks, milestones and
- Work Breakdown Structure
- Coding
- Deliverables
- Design
Show answer
Answer: (c) Deliverables
Q208. Which of the following is NOT a software measure?
- No. of defects
- Defects per function point
- Lines of Code
- No. of function points
Show answer
Answer: (b) Defects per function point
Why: Defects per function point is a metric (it combines two measures).
Q209. Capability Maturity Model (CMM) has ______ levels.
- 4
- 5
- 3
- 2
Show answer
Answer: (b) 5
Q210. The conceptual interface between the 'internal' application and the 'external' user world is known as
- Count Data Functions
- Application Boundary
- Development count
- Control Information
Show answer
Answer: (b) Application Boundary
Q211. Every project has a defined number of staff members. As time allocation occurs, the project manager must ensure that no more than the allocated number of ______ have been scheduled at any given time.
- Tasks
- People
- Days
- Components
Show answer
Answer: (b) People
Q212. SEI stands for
- Software Engineering Institute
- Software Electric Institute
- Software Electronics Institute
- System Engineering Institute
Show answer
Answer: (a) Software Engineering Institute
Q213. Software Project Planning is an activity carried out by the
- Requirements Engineers
- SQA team
- Project Manager
- Software Developer
Show answer
Answer: (c) Project Manager
Q214. ______ files are the logical files that the customer understands and that must be maintained by the system.
- Raw
- External
- Logical
- Internal
Show answer
Answer: (d) Internal
Q215. In measuring software process quality by using control charts, if the gap between the defects reported and the defects fixed is increasing, it means
- the product is in unstable condition
- the product is ready for shipment
- the product is in stable condition
- None of the above
Show answer
Answer: (a) the product is in unstable condition
Q216. ______ is fundamental for providing mechanisms for objective evaluation of any process or activity.
- Metrics
- Measurement
- Indicators
- Pointers
Show answer
Answer: (b) Measurement
Q217. ______ life cycle models appreciate the need for iteration within and between phases.
- Object-Oriented
- Spiral Model
- Extreme Programming
- Rapid Application Development
Show answer
Answer: (a) Object-Oriented
Q218. The ______ of a product can be measured if we can measure its non-functional properties, i.e. maintainability, integrity, usability, etc.
- Quality
- Quantity
- Price
- Size
Show answer
Answer: (a) Quality
Q219. If the gap between the defects reported and the defects fixed is decreasing, the product is in which condition?
- Defective
- Unstable
- Neutral
- Stable
Show answer
Answer: (d) Stable
Q220. Capers Jones divided software-related activities into ______ categories.
- 35
- 40
- 20
- 25
Show answer
Answer: (d) 25
Why: Source key kept; could not be verified outside the lecture.
Q221. Mature organizations are system oriented and they ensure
- Consistency
- Performance
- Quality
- Stability
Show answer
Answer: (d) Stability
Why: Source key kept; could not be verified outside the lecture.
Q222. The project manager has to first come up with the schedule and then monitor the ______ of the project to ensure that things are happening according to the schedule. Quoting Fred Brooks: "Projects fall behind schedule ______ at a time."
- progress, one day
- progress, three days
- schedule, two days
Show answer
Answer: (a) progress, one day
Q223. ______ is necessary to learn from the mistakes and for the continuous improvement of the process.
- Risk analysis
- Good decision
- Postmortem analysis
- Improvement
Show answer
Answer: (c) Postmortem analysis
Q224. If an employee number appears twice in an ILF/EIF, count the DET
- thrice
- twice
- once
- null
Show answer
Answer: (c) once
Q225. Control charts are of the following two types:
- Individual control charts and Stable control charts
- Moving range control charts and Individual control charts
- Moving range control charts and Stable control charts
- Independent control charts and Stable control charts
Show answer
Answer: (b) Moving range control charts and Individual control charts
Q226. ______ interfaces contain data that is shared with other programs.
- Logical
- User
- External
- Internal
Show answer
Answer: (c) External
Part 2: Subjective Questions
Q1. What is meant by degree of rigor? How is it decided, and which parameters are considered before the decision is made? (5 marks)
The degree of rigor is how formally the process framework is applied to a project: how many tasks, how much documentation and how much quality assurance. It is chosen from the type of project and a set of adaptation criteria.
Project types: concept development, new application development, application enhancement, application maintenance and reengineering.
Adaptation criteria (parameters):
- size of the project
- number of potential users
- mission criticality
- application longevity
- stability of requirements
- ease of customer/developer communication
- maturity of the applicable technology
- performance constraints
- embedded and non-embedded characteristics
- project staff
- reengineering factors
Each criterion gets a grade (1 to 5), the grades are weighted and averaged into the Task Set Selector (TSS). The TSS value picks the degree of rigor: casual, structured, strict or quick reaction.
Q2. Differentiate between casual and structured degrees of rigor (and name the other two). (3 marks)
| Degree | What is applied |
|---|---|
| Casual | All process framework activities are applied, but only a minimum task set is required. Umbrella tasks and documentation are reduced. Basic SE principles are still followed. |
| Structured | The complete process framework is applied with the appropriate framework activities, related tasks and umbrella activities (SQA, SCM, documentation, measurement), carried out in a streamlined way. |
| Strict | The full process is applied with a robust set of umbrella activities and full documentation, for projects where high quality is essential. |
| Quick reaction | The framework is applied, but only the tasks essential for good quality are done (for example an emergency fix); documentation and reviews follow afterwards. |
Q3. A project has a TSS value of 2.6, which falls in both the structured and the strict range. How can the project manager select the degree of rigor? (3 marks)
The TSS ranges overlap, so a value such as 2.6 does not decide the category automatically. The project manager uses judgment on the project's own characteristics:
- If the project is large, critical, has stable requirements and a long life, choose strict.
- If budget, schedule or team size is tight and the risk is moderate, choose structured.
- Take the adaptation criteria with the highest grades (mission criticality, longevity, performance constraints) as the deciding factors, and document the choice.
Q4. Differentiate between the open paradigm and the synchronous paradigm in team management (Constantine's paradigms). (2 marks)
| Open paradigm | Synchronous paradigm |
|---|---|
| Combines the control of the closed paradigm with the innovation of the random paradigm. | Relies on the natural compartmentalization of a problem; members work on separate pieces. |
| Work is collaborative, with heavy communication and consensus-based decisions. | There is little active communication among team members. |
| Good for complex, innovative problems. | Good when the problem divides cleanly into independent parts. |
Q5. How do Kraul and Streeter categorize project coordination techniques? (3 marks)
Kraul and Streeter group coordination techniques into five categories:
- Formal, impersonal approaches: software engineering documents, technical memos, milestones, schedules, project control tools, change requests, error tracking reports.
- Formal, interpersonal procedures: QA activities, design and code reviews, status review meetings.
- Informal, interpersonal procedures: group meetings for information dissemination and problem solving, co-location of staff.
- Electronic communication: email, bulletin boards, video conferencing.
- Interpersonal networking: informal discussions with people outside the project who have experience or insight.
Q6. What are the types of control charts used in software engineering? Differentiate between them. (3 marks)
Two types are used: the moving range (mR) control chart and the individual control chart.
| Moving range chart | Individual chart |
|---|---|
| Plots the absolute difference between successive values, mR = |mi − mi+1|. | Plots the actual metric values in time order. |
| Shows variation between successive measurements. Centre line is the average mR; upper limit = 3.268 × mR-bar. | Centre line is the average Am; limits UNPL = Am + 2.66 × mR-bar and LNPL = Am − 2.66 × mR-bar. |
| Drawn first. If it is stable, the mR-bar can be used for the individual chart. | Used to see whether the process itself is in control. |
Q7. What are the uses of control charts? What does it mean if 8 consecutive values lie on one side of Am? (3 marks)
A control chart is a graphical technique used to decide whether a trend in metric data is statistically valid and which changes are meaningful rather than random.
- Tells whether the process is in control (stable and predictable) or out of control.
- Separates normal variation from special causes that need investigation.
- Shows whether improvement actions really changed the process, which helps improve productivity.
- Supports decisions with data instead of guesses.
The process is considered out of control if a single value lies outside the UNPL, 2 of 3 successive values lie more than 2σ from Am, 4 of 5 lie more than 1σ from Am, or 8 consecutive values lie on one side of Am. So 8 values on one side means the process has shifted and must be investigated.
Q8. Briefly explain the law of diminishing returns. Discuss it in view of cost versus efficiency. (5 marks)
The law of diminishing returns says that after a certain level of performance has been reached, continuing to add effort or resources produces smaller and smaller gains, and eventually a decline in effectiveness.
- Cost keeps rising steadily with every extra unit of effort (more testing, more people, more reviews).
- Efficiency (benefit per unit of cost) rises quickly at first, then flattens and finally falls.
- So there is an optimal point, the "knee" of the curve, where adding more cost no longer pays for itself. A manager should stop investing around that point.
Q9. Give any two factors related to product revision and any three factors related to product operation (McCall). (2 + 3 marks)
- Product revision: maintainability (ease of finding and fixing defects), flexibility (ease of adding new features), testability (effort to test the program).
- Product operation: correctness (does the program meet its specification), reliability (performs its function with required precision), efficiency (computing resources needed), integrity (control of unauthorized access), usability (effort to learn and operate).
Q10. What does risk analysis involve? (2 marks)
Risk analysis and management deal with three concerns:
- Future: what risks may derail the project, that is, what may go wrong?
- Change: what changes may cause a risk to strike?
- Choice: what options are available for each risk?
In practice it covers risk identification, risk projection (likelihood and consequences), risk assessment and planning how to mitigate, monitor and manage each risk.
Q11. What is risk? Give two characteristics of risk and the words of Peter Drucker about it. (3 marks)
Risk is the possibility of loss: something that may go wrong in the future and has not happened yet. Two characteristics:
- Uncertainty: the risk may or may not happen (probability between 0 and 100%).
- Loss: if it becomes reality, unwanted consequences or losses will occur.
Peter Drucker: "While it is futile to eliminate risk, and questionable to try to minimize it, it is essential that the risks taken be the right risks."
Q12. How can the defect removal efficiency be found with the help of the bug seeding technique? (5 marks)
Bug seeding: a known number of artificial defects (S) is deliberately added to the program before testing. After testing, count how many seeded defects (s) and how many real defects (n) were found.
- The seeded defects found give the detection rate: s / S.
- Estimated total real defects = n × S / s.
- DRE = defects removed / total defects present, which with the estimate above is DRE = s / S (the fraction of defects the testing caught).
Example: S = 50 seeded, s = 40 found, n = 80 real found. Estimated real defects = 80 × 50 / 40 = 100, so DRE = 80/100 = 80%.
Without seeding, DRE = E / (E + D), where E = errors found before delivery and D = defects found after delivery. For example, E = 90 and D = 10 gives DRE = 90/100 = 90%.
Q13. What measures can we take to mitigate and monitor risk? What does RMMM stand for? (5 marks)
RMMM stands for Risk Mitigation, Monitoring and Management plan. Take staff turnover as an example:
- Mitigation (reduce the chance or impact): meet current staff to find the causes of turnover, fix the causes before the project starts, spread knowledge so no one person is critical, define documentation standards, hold peer reviews, assign backup people.
- Monitoring (watch the risk and its factors): team attitude and cohesion, interpersonal relationships, compensation and benefit problems, availability of jobs inside and outside the organization.
- Management / contingency (if the risk happens anyway): activate the backup staff, reorganize the team and speed up knowledge transfer.
Each important risk is documented in a risk information sheet so it is reviewed regularly.
Q14. Explain the democratic decentralized (DD) team organization. Why is it best for research projects? (2 marks)
In a democratic decentralized team there is no permanent leader. Task coordinators are appointed for short durations and then replaced by others. Decisions on problems and approach are made by group consensus, and communication among team members is horizontal.
Why it suits research projects:
- Research problems are uncertain and difficult, and decentralized teams generate more and better solutions than individuals.
- Everyone's ideas count, which encourages creativity and peer review.
- Team spirit and job satisfaction are high, so members stay motivated over a long project.
- There is less need for a rigid hierarchy when the path to the answer is not known in advance.
Q15. How can metrics be applied in small organizations? (3 marks)
Small organizations can benefit from metrics if they keep the programme simple and cheap:
- Start with clear goals (what do we want to improve?) and only a few metrics, for example effort, schedule, size (LOC or FP) and errors found before and after release.
- Collect data from what the team already produces (timesheets, defect reports, review records) instead of adding new overhead.
- Use simple tools such as spreadsheets and plain graphs.
- Build a baseline over a few projects and use it for estimating the next one.
- Review results regularly, and drop metrics that nobody uses.
Q16. Explain the steps used in project estimation. (5 marks)
- Establish the scope of the software (context, information objectives, function, performance).
- Collect historical (baseline) data from past similar projects.
- Decompose the problem into functions (or process activities) that can be estimated.
- Estimate the size of each part (LOC or function points), often with optimistic, most likely and pessimistic values.
- Convert size to effort using productivity data or an empirical model such as COCOMO.
- Derive cost and duration from the effort and the available staff.
- Estimate with more than one technique and reconcile the differences.
- Record assumptions and risks, and update the estimate as the project proceeds.
Q17. What are the terms contingency plan and risk assessment? (2 marks)
- Risk assessment: identifying the risks, estimating their likelihood and impact (risk exposure) and judging whether each is acceptable against a referent level.
- Contingency plan: a plan prepared in advance of the actions to take if a risk actually occurs, so the project can recover quickly.
Q18. Why do we need metrics for software? Why do software engineers use measures? (2 marks)
- Metrics give better insight into the state of the process or product. They are indicators of problems, not the problems themselves.
- A metric relates individual measures to give a normalized view, for example defects per function point.
- Measures are used to characterize, evaluate, predict and improve processes, products and resources.
- A software engineer uses measures to judge the quality of the analysis and design models, the source code and the test cases, and at project level to track errors and defects (errors per function point, errors per review hour, errors per KLOC).
Q19. How can you identify problems in software? (3 marks)
Problems are identified through metrics and indicators:
- High error and defect counts in reviews and testing (errors per function point or per KLOC).
- A control chart that shows an out-of-control signal.
- A widening gap between defects reported and defects fixed.
- Poor design metrics, such as high coupling or many ripple defects.
- Rising spoilage (cost of fixing defects after release) and a falling defect removal efficiency.
- Schedule slips against milestones.
Q20. What is software scope estimation? (5 marks)
Scope describes the data and control to be processed, the function, performance, constraints, interfaces and reliability of the software. It is stated through the context, information objectives, function and performance.
Determining the scope (and checking that it is feasible) is the first planning activity. It is a prerequisite for all estimates (resources, time and budget), so the project manager estimates the scope first and then moves to resource and time requirements.
Q21. "Every task or group of tasks should be associated with a project milestone." What is the potential benefit of this? (2 marks)
- A milestone marks the completion of one or more work products, usually after a QA review, so progress can be measured objectively.
- It gives the manager checkpoints to see whether the project is on schedule and to react early.
- It makes people accountable for clear outcomes and helps the customer to see real progress.
Q22. In an application an ILF or EIF is used in four processes. How much will we count for that ILF or EIF? Give the reason. (3 marks)
It is counted once. A data function (ILF or EIF) is counted for its existence in the application, not for how many processes use it. The four processes are counted separately as transactional functions (EI, EO, EQ), and each of them records the file as a file type referenced (FTR).
Q23. "The relationship between the number of people and the time to develop an application is not linear." What do you understand by this? Why does productivity fall when team members increase? Show that a team of 7 does less work than a team of 4 when communication overhead is 5% per channel. (5 marks)
Doubling the team does not halve the time (Brooks's law). More people means more communication channels, n(n − 1)/2, more training and coordination, and some tasks cannot be split. So each extra person adds less useful work than the previous one, and productivity per person falls.
Calculation (work accomplished = n × [1 − overhead per channel × number of channels], one unit of work per person):
| Team size | Channels n(n−1)/2 | Overhead (5% each) | Work accomplished |
|---|---|---|---|
| 4 | 6 | 30% | 4 × (1 − 0.30) = 2.8 |
| 7 | 21 | 105% | 7 × (1 − 1.05) = −0.35, i.e. no useful work |
So the team of seven accomplishes less than the team of four.
Q24. Do you think macroscopic schedules are sufficient to schedule a project, or should they be refined to a lower level? Give reasons. (5 marks)
They are not sufficient. A macroscopic schedule gives only the overall framework and major milestones. It should be refined into a detailed schedule because:
- Day-to-day work needs specific tasks, durations, dependencies and owners.
- Progress can only be tracked and delays detected if tasks are small and measurable.
- Resources cannot be allocated, and effort cannot be validated, without detail.
- Problems at the detailed level (a late task on the critical path) are invisible in a high-level plan.
Q25. Is the use of statistical control techniques such as Walter Shewhart's valid in a domain like software engineering? Give your comments. (3 marks)
Shewhart's charts were designed for manufacturing, where many identical products are made by a stable process. Software is different: every project is unique, human factors dominate and data points are few, so the limits are less precise.
Even so, they are useful as indicators. Control charts can show trends, shifts and unusual values in defect rates, effort or review results when data comes from similar projects and a consistent measurement technique. They should be used to prompt investigation, not as exact predictions.
Q26. Can we guarantee a 100% risk-free software development process? Comment with reasons. (5 marks)
No. There is no such thing as risk-free software, because every activity (and also doing nothing) carries risk.
- Requirements, technology, people and the market keep changing, so unforeseen risks appear.
- Not fixing a bug, or not releasing, is itself a risk (cost, reputation, lost revenue).
- Adding more process does not remove risk. The practical approach is to identify, assess and mitigate risks proactively and to make mistakes easy to undo, with contingency plans for those that still occur.
Q27. If bugs are fixed, what will be the effect on the quality of the software? (5 marks)
Fixing defects improves quality: known faults are removed, so failures drop, reliability and customer satisfaction rise and the defect removal efficiency improves.
- Defect repair is a maintenance activity that supports the released functionality.
- Each fix can introduce new defects, so it must be followed by regression testing.
- The quality trend can be watched through the gap between defects reported and defects fixed.
Q28. What is effort validation in project scheduling? (2 marks)
Every project has a defined number of staff members. As time is allocated, the project manager must ensure that no more than the allocated number of people are scheduled at any given time. This is effort validation.
Q29. Do you think flexibility and maintainability are the same thing? Give the reason. (3 marks)
No. Flexibility is the ease of expanding the product with new feature sets and capabilities. Maintainability is the ease of fixing bugs and adding minor features. Both depend on the architecture and techniques used and on the quality of the code, but they measure different kinds of change.
Q30. If spoilage is decreasing, what is the effect on maintainability? (3 marks)
Spoilage is a cost-oriented metric for maintainability: the cost to correct defects found after the software has been released. Spoilage cost is plotted against overall project cost over time. If spoilage is decreasing, the cost of fixing released defects is falling relative to project cost, so the overall maintainability of the software produced is improving.
Q31. Define baseline data. What is the reason for having it? (3 marks)
A metrics baseline is data from past projects that has been collected, cleaned and stored in a database. To use data for estimation and drawing conclusions it must be base-lined.
- The data must be reasonably accurate and collected over many projects.
- Measures must be consistent (same technique or yardstick).
- Applications should be similar to the work being estimated.
- There should be feedback to improve the baseline's quality.
The baseline gives benefits at the process, project and product level.
Q32. Do you agree that ILFs and EIFs are both user identifiable groups of data? Comment. (3 marks)
Yes. Both are user identifiable groups of logically related data or control information.
- An ILF is maintained within the boundary of the application, through one or more of its elementary processes.
- An EIF is only referenced by the application and is maintained within the boundary of another application. So an EIF of one application is an ILF of another.
Q33. Given the data 4, 3, 1, 3, 5 for projects 1 to 5, draw a moving range control chart and explain whether the process is stable. How is the individual control chart developed from it? (5 marks)
Step 1: moving ranges mR = |mi − mi+1|
| Pair | 1-2 | 2-3 | 3-4 | 4-5 |
|---|---|---|---|---|
| mR | |4−3| = 1 | |3−1| = 2 | |1−3| = 2 | |3−5| = 2 |
mR-bar = (1 + 2 + 2 + 2) / 4 = 1.75. Upper limit of the mR chart = 3.268 × 1.75 = 5.72. All mR values are below it, so the variation is stable.
Step 2: individual chart. Am = (4 + 3 + 1 + 3 + 5) / 5 = 3.2. UNPL = Am + 2.66 × mR-bar = 3.2 + 4.66 = 7.86. LNPL = 3.2 − 4.66 = −1.46 (effectively 0, since the metric cannot be negative).
Every value (1 to 5) lies between the limits and there is no run of 8 on one side of Am, so the process is stable (in control). With only five points the limits are rough, so more data would strengthen the conclusion.
Q34. What is meant by risk projection? (2 marks)
Risk projection (risk estimation) rates each risk in two ways: the likelihood that it will occur and the consequences if it does. It has four activities:
- Establish a scale that reflects the perceived likelihood of the risk.
- Delineate the consequences of the risk.
- Estimate the impact of the risk on the project and product.
- Note the overall accuracy of the risk projection.
Q35. Can a single logical file be counted as both an EIF and an ILF for the same application? (2 marks)
No. A logical file cannot be counted as both an ILF and an EIF for the same application. If the data group satisfies the rules of both, it is counted as an ILF.
Q36. Discuss the role of interdependency and time allocation in fulfilling a realistic project schedule. What if interdependency is not determined? (5 marks)
- Interdependency: the dependency of each compartmentalized task must be determined. Some tasks occur in sequence, others in parallel, and some cannot start until the work product of another is available.
- Time allocation: every task is given work units (for example person-days of effort) and a start and end date, which depend on the interdependencies and the resources available.
If interdependency is not determined, tasks may be scheduled out of order or be blocked waiting for inputs, resources sit idle, the critical path is unknown and the overall schedule becomes unrealistic and slips.
Q37. Look at the graph below (total reported defects, defects fixed to date, defects still to be fixed). Is the product stable or not? (3 marks)
Rule: if the gap between the defects reported and the defects fixed is increasing, the product is unstable. If the gap is decreasing, the product is stable.
In this graph the total-reported curve flattens (few new defects are arriving), the fixed-to-date curve keeps climbing towards it and the defects-still-to-be-fixed curve levels off. The gap is closing, so the product is moving towards a stable condition. Note: a shared answer called it unstable, which is right only for a graph where the gap keeps widening. The original figure was redrawn approximately.
Q38. For a requirement specification, Nf = 25, Nnf = 5 and Nui = 10. Calculate the lack of ambiguity. How is the quality of a software requirement specification measured? (5 marks)
Lack of ambiguity (specificity) is measured as Q = Nui / Nr, where Nr = Nf + Nnf (total requirements).
- Nr = 25 + 5 = 30
- Q = 10 / 30 = 0.33
The closer Q is to 1, the less ambiguous the specification, so 0.33 shows that many requirements are open to interpretation.
A requirements specification is measured through lack of ambiguity, completeness, consistency, correctness, understandability, verifiability, achievability, concision, traceability, modifiability, precision and reusability.
Q39. Discuss the factors to consider when deciding whether to develop a project from scratch (build) or use third-party components (buy). Is outsourcing important? (3 or 5 marks)
- Developer costs: the time to evaluate and integrate a component is usually far smaller than the time to build the same functionality. Developers often want to build simply because it is more fun, which is not an economic reason.
- Feature costs: building gives exactly the features needed; a component may lack a feature or contain features you never use that add learning time and complexity.
- Time to market: deploying a component is dramatically faster. Estimate the delay's effect on profitability.
- Product costs: the price of the component is typically a small part of the total cost of ownership.
- Also consider support, licensing, integration risk and long-term maintenance.
To compare options, use a decision tree with the expected cost = Σ (path probability × estimated path cost). Outsourcing and buying are important because they save time and use specialist skills, but they need contract and quality control.
Q40. Define compartmentalization in the context of a project schedule. (2 marks)
The project must be compartmentalized into a number of manageable activities and tasks. To do this, both the product and the process are decomposed.
Q41. In order to assess the overall project risks, what questions need to be addressed? Give any five. (3 marks)
- Have top software and customer managers formally committed to support the project?
- Are end-users committed to the project and the system/product to be built?
- Are requirements fully understood by the team and the customers?
- Have customers been involved fully in the definition of requirements?
- Do end-users have realistic expectations?
- Is the project scope stable?
- Does the software team have the right mix of skills?
- Are project requirements stable?
- Does the project team have experience with the technology to be implemented?
- Is the number of people on the project team adequate to do the job?
Q42. State the three counting rules for an External Input (EI). (3 marks)
- The data or control information is received from outside the application boundary.
- At least one ILF is maintained if the data entering the boundary is not control information that alters the behavior of the system.
- For the identified process, one of these applies: the processing logic is unique from that of other external inputs, or the set of data elements is different from other external inputs, or the ILFs or EIFs referenced are different from those of other external inputs.
Q43. How is the design of software measured quantitatively? (3 marks)
The quality of the architectural design is measured through its complexity:
- Structural complexity: S(i) = fout(i)2, where fout is the fan-out of module i.
- Data complexity: D(i) = v(i) / [fout(i) + 1], where v(i) is the number of input and output variables of module i.
- System complexity: C = Σ (S(i) + D(i)).
Higher values mean a more complex design, which will be harder to integrate, test and maintain.
Q44. Differentiate between generic risks and product-specific risks. (2 marks)
Generic risks are threats to every software project. Product-specific risks can be identified only by those with a clear understanding of the technology, the people and the environment of the particular project.
Q45. What is an EIF? How does it differ from an ILF? (2 marks)
An external interface file (EIF) is a user identifiable group of logically related data or control information that is referenced by the application but maintained within the boundary of another application. An ILF is also user identifiable, but it is maintained within the boundary of the application being counted.
Q46. What are the responsibilities of a project manager? (3 marks)
To plan and run a project successfully, a project manager must look after:
- Product quality: the acceptable quality level and how to ensure it.
- Risk assessment: potential problems and how to mitigate them.
- Measurement: size, productivity and quality, and how to benchmark them.
- Cost estimation.
- Project schedule.
- Customer communication: what is needed and how to maintain it consistently.
- Staffing: how many people with what skills.
- Other resources: hardware and software.
- Project monitoring: how progress is tracked.
Q47. What are the types of risks? (3 marks)
- Project risks: threaten the schedule and cost (budget, schedule, personnel, resource, customer and requirements problems).
- Technical risks: threaten quality and timelines, and may make implementation difficult or impossible (design, implementation, interface, verification, maintenance problems, leading-edge technology).
- Business risks: threaten the viability of the product (marketability, fit with business strategy, how to sell it, losing budget or personnel commitments).
Q48. Identify the mandatory and optional record element types (RETs) in a human resource application. Differentiate between optional and mandatory subgroups. (5 marks)
Definitions: a mandatory subgroup must be used (one of the subgroups) in an elementary process. An optional subgroup may be used or not (the user has the option of using one or none).
HR example (personal information, previous experience or course, salary details, workshops or training):
- Mandatory: personal information and salary details, because every employee has them.
- Optional: previous experience / course and workshops or trainings attended, because an employee may have none.
For "Employee: permanent or contract" and "Employee: married or single", every employee must be in exactly one subgroup of each pair, so these are mandatory subgroups. Under the IFPUG rule each subgroup counts as one RET (a file with no subgroups counts as one RET).
Q49. In the context of function points, which elementary process sends data or control information outside the application boundary? (2 marks)
The External Output (EO). Its primary intent is to present information to the user through processing logic beyond simple retrieval (calculations, derived data). The External Inquiry (EQ) also sends data out, but only by retrieving it with no extra processing.
Q50. Reactive and proactive risk strategies: which is preferable? (3 marks)
- Reactive (the "Indiana Jones school"): do nothing until the risk becomes a problem, then fight the fire. It has a rare chance of success in real projects.
- Proactive: identify risks early, assess them and plan mitigation and contingency before they strike.
The proactive approach is preferable, because its main objective is to avoid or reduce risk before it causes loss.
Q51. What is the difference between a measure and a metric? (2 marks)
- A measure is a numerical value assigned to an attribute according to defined criteria, for example the number of errors in a system or the temperature at one moment.
- A metric relates individual measures to give a normalized or time-based view, for example errors per person-hour or defects per function point.
Q52. Define feasibility assessment. Give three of its dimensions. (3 marks)
A feasibility assessment checks whether we can build software that meets the scope. Its dimensions are:
- Technology: is the project technically feasible and within the state of the art?
- Finance: can it be completed at a cost the organization, client or market can afford?
- Time: will it beat the competition to market and meet the deadline?
- Resources: does the organization have the hardware and software tools, reusable components and people needed?
Q53. Count the risk exposure (RE) for this risk: only 70% of the 60 software components planned for reuse will be integrated; the rest must be custom developed; the average component costs 100,000; the risk probability is 80%. (5 marks)
- Components to be developed from scratch = 30% of 60 = 18.
- Risk impact (cost) = 18 × 100,000 = 1,800,000.
- RE = probability × cost = 0.8 × 1,800,000 = 1,440,000.
Q54. What is the major difference between the rapid prototyping model and the RAD model? (2 marks)
The RAD model is applicable when requirements are fully understood and certain. The rapid prototyping model is applicable when requirements are uncertain.
Q55. Discuss the usability of software and the factors that affect it. (5 marks)
Usability is the effort required to learn, operate, prepare input for and interpret the output of a program. A highly usable system needs low physical and intellectual skill to learn.
- Intuitive interface that follows good GUI practice.
- Amount of training needed (an excellent system needs very little).
- Ease of learning and operation for new and experienced users.
- Clear documentation and help, and error handling that is easy to understand.
- Consistency of screens and commands.
If even an experienced user needs extensive training and still finds the software hard to use, the software has a usability problem.
Q56. Explain the waterfall model. (3 marks)
The waterfall (linear sequential or classical life cycle) model was the first published model of the software process. Work flows downward through phases: requirements, design, implementation, testing, deployment and maintenance.
- It is document driven: a set of documents is produced at each phase, which also makes maintenance easier.
- It has no provision for feedback or going back to a previous stage in the original form.
- It suits projects where requirements are well understood and stable. Its drawback is that a working product is seen only at the end.
Q57. Write two guidelines for designing an application that will increase its maintainability. (3 marks)
- Use low coupling and high cohesion, with modular design, so a change stays inside one module and ripple defects are rare.
- Follow coding and documentation standards (meaningful names, comments, up-to-date design documents) so that other people can understand and change the code.
Q58. What will be the effect on software quality if the ripple frequency becomes too large? (3 marks)
A large ripple frequency means that a change in one place causes defects in many others, which indicates tight coupling. The design is therefore not maintainable, the software becomes hard to change, and the software quality decreases. Software quality assurance and good design practice are needed to avoid this.
Q59. Define schedule risk. (2 marks)
Schedule risk is the degree of uncertainty that the project schedule will be maintained, that is, the exposure to loss from a program not meeting its schedule objectives. It is the risk that the project takes longer than planned. It can lead to cost risk (longer projects cost more) and performance risk (if the product is finished too late to fulfil its purpose).
Q60. What will be the implication if the feasibility of a product is collected incorrectly? (2 marks)
The decision to start (or reject) the project is based on wrong information. The project may be approved although it is not technically, financially or time-wise achievable, which leads to cost and time overruns, wasted resources and possibly project failure. A good project may also be rejected wrongly.
Part 3: Short Notes & Key Terms
- Software Engineering
- The set of processes and tools used to develop software, balancing characteristics such as cost, quality, reliability and time.
- Four P's of project management
- People, Product, Process and Project. Project management is a people-intensive activity.
- Error vs defect
- An error is a problem found before the software is delivered; a defect is a problem found after delivery (reported by the client).
- Software development loop
- Status quo (current state of affairs), problem definition, technical development and solution integration.
- Build and Fix model
- A haphazard approach where the product is built without proper design or specification and then fixed until the customer accepts it.
- Waterfall model
- The first published, linear sequential (classical life cycle) model. It is document driven and has no feedback to earlier stages in its original form.
- Prototyping model
- Used when the customer cannot define requirements clearly. A prototype is built, shown to the user and refined.
- RAD model
- Rapid application development: a high-speed adaptation of the linear sequential model with a very short development cycle, suitable when requirements are well understood.
- Incremental model
- Delivers the product in small versions, so user feedback comes early. A good approach when a working core product is required quickly.
- Spiral model
- Proposed by Barry Boehm. Iterative and risk driven, with two dimensions: radial (cumulative cost) and angular (progress).
- Synchronize and Stabilize
- The development model adopted by Microsoft.
- Extreme Programming (XP)
- An object-oriented, iterative model effective when requirements change a lot and scope is limited. Pair programming is one of its practices.
- Fountain model
- An object-oriented life cycle model that recognizes iteration within and between phases.
- Rational Unified Process (RUP)
- Object-oriented process with a horizontal (dynamic) dimension for phases over time and a vertical (static) dimension for activities.
- Formal methods model
- Uses mathematical methods to specify, develop and verify computer-based systems.
- Capability Maturity Model (CMM)
- SEI framework that judges the process maturity of an organization. It has five levels, and every organization starts at level 1.
- CMM levels
- Level 1 Initial, level 2 Repeatable (basic project management), level 3 Defined, level 4 Managed (process and product quality controlled), level 5 Optimizing (continuous improvement).
- Key Process Area (KPA)
- A cluster of related activities at a CMM level. It is described by goals, commitments, abilities, activities and ways of monitoring and verifying implementation.
- CMMI
- Integrates system and software disciplines into a single process improvement framework.
- SEI
- Software Engineering Institute, the developer of CMM.
- MOI model
- Weinberg's model of leadership: Motivation, Organization and Ideas/Innovation.
- Motivation
- The ability to encourage technical people to produce their best.
- Constantine's team paradigms
- Closed (traditional hierarchy), random (loose, individual initiative), open (control plus innovation) and synchronous (natural compartmentalization of the problem).
- Democratic decentralized (DD) team
- No permanent leader; task coordinators change over time; decisions by consensus; horizontal communication. Best for difficult problems and good for team spirit.
- Controlled decentralized (CD) team
- A defined leader coordinates tasks, with subgroups and problem solving done by the group. It has both vertical and horizontal communication.
- Controlled centralized (CC) team
- The team leader solves problems and coordinates internally, with vertical communication.
- Kraul and Streeter coordination techniques
- Formal impersonal, formal interpersonal, informal interpersonal, electronic communication and interpersonal networking.
- Reel's five steps
- Start on the right foot, maintain momentum, track progress, make smart decisions and conduct a postmortem analysis.
- Postmortem analysis
- Review of a finished project to learn from mistakes and improve the process continuously.
- W5HH principle
- Boehm's seven questions: Why is the system being developed? What will be done? When? Who is responsible? Where are they organizationally located? How will the job be done technically and managerially? How much of each resource is needed?
- Reasons for project failure
- Unrealistic deadlines, unclear or incomplete requirements, lack of user input, requirement creep, miscommunication and no established processes.
- Software scope
- Describes the data and control to be processed, function, performance, constraints, interfaces and reliability. It is a prerequisite of all estimates.
- Feasibility dimensions
- Technology, finance, time and resources.
- Planning activities for estimation
- Software scope estimation, resource requirements and time requirements.
- Project scheduling principles
- Compartmentalization, interdependency, time allocation, effort validation, defined responsibilities, defined outcomes and defined milestones.
- Macroscopic schedule
- A schedule developed at the early stage of planning, showing the overall framework and major milestones. It is refined later into a detailed schedule.
- Timeline (Gantt) chart
- A bar chart that shows tasks against time.
- Degree of rigor
- How formally the process is applied: casual, structured, strict or quick reaction.
- Task Set Selector (TSS)
- A value computed from the adaptation criteria grades that selects the task set and degree of rigor. A low TSS (about 1.2 or less) means casual.
- LOC and FP estimation
- LOC-based estimation decomposes the problem by software functions; FP-based estimation uses information domain values. LOC is language dependent and easy to compute.
- COCOMO
- Empirical cost model using thousand delivered source instructions (KDSI/KLOC) as the unit of size. Simplest version: E = 3.2 (KLOC)^1.05.
- Common estimation model form
- E = A + B × (ev)^c, where ev is the estimation variable (LOC or FP).
- Empirical models
- Statistical models based on historical data.
- Decision tree and expected cost
- Used for build-versus-buy decisions: expected cost = Σ (path probability × estimated path cost).
- Brooks's law
- Adding people to a project does not cut the time proportionally. The relation between people and effort is not linear because of communication overhead (n(n−1)/2 channels).
- Law of diminishing returns
- Beyond a certain level of performance, more effort gives smaller gains and eventually a decline in effectiveness.
- Risk
- A problem that threatens the success of a project but has not happened yet: uncertainty plus possible loss.
- Risk types
- Project risks, technical risks and business risks. Generic risks threaten every project; product-specific risks depend on the particular project.
- Schedule, cost and performance risk
- Schedule risk: the schedule may slip. Cost risk: the budget may be exceeded. Performance risk: the product may not meet its requirements or be fit for use.
- Risk exposure (RE)
- RE = probability of the risk × cost of the loss if it occurs.
- Risk impact assessment
- Focuses on consequences for performance, support, cost and schedule.
- Risk projection
- Rates each risk by likelihood and consequences; also called risk estimation.
- Proactive vs reactive risk strategy
- Proactive plans ahead to avoid risk. Reactive (Indiana Jones school) waits for the risk to happen and then reacts.
- RMMM
- Risk Mitigation, Monitoring and Management plan.
- Mitigation, monitoring, management
- Mitigation reduces the likelihood or impact; monitoring tracks the risk factors; management (contingency) is the action taken when the risk occurs.
- Measure vs metric
- A measure is a single numeric value; a metric relates measures (for example defects per function point).
- Baseline data
- Cleaned data from many similar past projects, collected consistently, used for estimation.
- Defect removal efficiency (DRE)
- DRE = E / (E + D): the share of defects removed before delivery. E = errors found before delivery, D = defects found after delivery.
- Bug seeding
- Adding known artificial defects to estimate how many real defects remain, using the share of seeded defects found.
- Spoilage
- Cost to correct defects found after release; plotted against project cost to see whether maintainability improves.
- Quality costs
- Prevention, appraisal and failure costs.
- McCall quality factors
- Operation: correctness, reliability, efficiency, integrity, usability. Revision: maintainability, flexibility, testability. Transition: portability, reusability, interoperability.
- Integrity formula
- Integrity = Σ [(1 − threat) × (1 − security)].
- Coupling
- Dependency between components: the greater the dependency, the greater the coupling. A large ripple-defect frequency indicates tight coupling.
- Software maintainability measures
- Mean time to change (MTTC), spoilage and the frequency of ripple defects.
- Control chart
- Statistical technique (Walter Shewhart, 1920s) that shows graphically whether a process is stable. Types: moving range chart and individual chart.
- UNPL and LNPL
- Upper and lower natural process limits on an individual control chart: Am ± 2.66 × mR-bar.
- Out-of-control signals
- One value outside the UNPL, 2 of 3 values beyond 2σ, 4 of 5 beyond 1σ, or 8 consecutive values on one side of Am.
- Defects reported vs fixed
- A widening gap means an unstable product; a shrinking gap means a stable one.
- Requirement quality metrics
- Specificity (lack of ambiguity) Q = Nui / Nr, where Nr = Nf + Nnf. Proposed by Davis in 1993.
- Toxic requirements
- Requirements that are filled with defects.
- Function points (FP)
- A size measure based on user-visible functions: EI (external input), EO (external output), EQ (external inquiry), ILF and EIF.
- ILF and EIF
- ILF: user-identifiable group of logically related data maintained within the application boundary. EIF: referenced by the application but maintained within another application's boundary.
- Elementary process
- The smallest unit of activity that is meaningful to the user.
- Application boundary
- The conceptual interface between the internal application and the external user world.
- Control information
- Data that influences an elementary process of the application being counted.
- RET and DET
- RET: record element type, a user-recognizable subgroup of data in an ILF/EIF (mandatory or optional). DET: data element type; a field repeated in a file is counted once.
- Refactoring
- Restructuring code without changing its external behavior. Bad smells include shotgun surgery, divergent change, duplicated code, large class and lazy class.
- Reengineering
- Restructures code, documentation and data, giving higher quality, lower maintenance effort and easier testing.
- Black box vs white box testing
- Black box checks the external functions; white box checks internal units, structures and their relationships.
- Verification vs validation
- Verification is performed at the end of each phase; validation checks the final product against the user's needs.
- Optional subgroups
- Subgroups where the user has the option of using one or none of them during an elementary process.
- Line of code (LOC)
- A size measure that depends heavily on individual programming style.
- Qualitative feedback and CMM
- Continuous process improvement at the optimizing level is enabled by qualitative feedback from the process.
No comments:
Post a Comment
Please give us your feedback & help us to improve this site.